1. Description
Pre-terminated Fibre optic cables
Plug-and play fibre eliminates the need for complicated sensitive field terminations and splices
Available in 4,12,24,36,72,144 cores or custom fibre counts
Fiber: singlemode OS1/OS2, G657, G652(9/125um), OM1(62.5/125um), OM2, OM3 and OM4(50/125um)
Connect with the following connectors ST, SC, LC,FC, MTRJ, SMA, E2000, MU Available in PC, UPC and APC
Qingying offer multi fibre cable assemblies , such as multimode MPO/MTP to 12 connectors and other types like 12 core SC UPC TO 12 core LC APC.
We can use bundle fibre cable(Loose tube, tight bugfered, breakout, steel tape armoured) or ribbon fibre cable(2, 4,6,8,10, 12 fibres).
G.652 | G.655 | 50/125μm | 62.5/125μm | ||
Attenuation | @850nm | ≤3.0 dB/km | ≤3.0 dB/km | ||
(+20°C) | @1300nm | ≤1.0 dB/km | ≤1.0 dB/km | ||
@1310nm | ≤0.36 dB/km | ≤0.40 dB/km | |||
@1550nm | ≤0.22 dB/km | ≤0.23dB/km | |||
Bandwidth (Class A) | @850nm | ≥500 MHz·km | ≥200 MHz·km | ||
@1300nm | ≥1000 MHz·km | ≥600 MHz·km |
Note:
A:The color of fiber in loose tube is arranged from NO.1 color successively.
B:Other color indentifications available on request
Factory Scale: Total Area of: 8000 square meters Production Staff: 60 to 100 Factory history: 10 years |
Certificates: ISO9001:2000 SGS RoHS CE |
Logistics Ability: Arrange the Mixed logistical for Election delivery as By Air and By Sea, over 10 years’ experience for logistical arrange. |
|
Features; Good uniformity and low insertion loss Low Polarization Dependent Loss Excellent Environmental Stability Excellent Mechanical Stability |
Delivery Time: Material Preparation Time: 3 days (or inventory) Production & Assembly Time 7 days Testing & Packaging Time: 2 days Total Delivery Time: 12 days in 20,000pcs for safe delivery lead time. The faster delivery could be negotiable. |
Applications: 1.Asynchronous Transmission Mode(ATM) Package for 250PCS : 2.Passive optical networks (PON) 3.Fiber to The Home (FTTH) Package dimensions : 46cm*33cm*23 CM 4.Local Area Networks (LAN) 5.Cable Television (CATV) 6.Test Equipment |